MY MIRROR PLUS / Real estate development

Bathroom mirrors, planned into the building.

From apartment schedules to final fit-out: develop a mirror package that works with the architecture, the services and the construction sequence.

For developers, main contractors, fit-out teams and project specifiers.

Discuss Your Project Explore the apartment layouts
Apartment master bathroom concept with a complete wide graphite LED mirror and double limestone vanity
Architectural concept / mirror dimensions and details follow the project brief.

02 / Resolve early

The expensive problems start before installation.

01

A mirror that fits the drawing, not the wall.

Tile build-up, finished dimensions and wall support are not always final when procurement starts.

Plan for itClose the finished-wall setting-out and fixing detail before the model is released.

02

A power outlet behind the wrong component.

The site provision can clash with a bracket, demister pad or driver enclosure.

Plan for itOverlay the approved rear layout with the electrical and wall elevations.

03

The right mirrors, on the wrong floor.

Similar sizes and mixed unit types make site sorting difficult.

Plan for itAgree model references and building / floor / unit identification in the packing plan.

03 / Apartment typologies

Different bathrooms. A controlled mirror schedule.

Complete round backlit mirror in a compact apartment bathroom with teal tiles and an ash vanity
Design concept / round backlit mirror / single basin.

Compact apartment

One clear focal point. Fewer site conflicts.

Use a round LED mirror to soften a narrow bathroom without adding a separate pair of wall lights. Set out the mirror from the basin centreline, then check the adjacent door, storage and finished wall width.

  • Coordinate diameter with the clear wall width.
  • Keep the touch target reachable above the basin.
  • Locate the power provision within the approved rear zone.
Include This Scope in My Enquiry

04 / Wall interface

Fix the mounting detail before the wall closes.

Coordinate the mirror assembly with the actual wall construction. A solid wall, a supported partition and a prefabricated bathroom pod need their own reviewed fixing details.

Wall support
Identify the substrate and backing zone. Agree the fixing design with the project’s responsible designer and installer.
Finished setting-out
Dimension from the finished wall and vanity, including tile thickness, basin centres and any adjacent cabinet doors.
Removal allowance
Check the lift-off or release direction against soffits, trim and side walls. A mirror that installs must also remain removable.
Side cutaway concept of a mirror mounting rail and supported bathroom wall construction
Mounting concept / project-specific substrate, support and fixings require drawing coordination.
Complete rear mirror assembly concept showing enclosed driver, demister pad, cable route and mounting brackets
Rear assembly concept / final positions depend on the approved model.

05 / Power & service access

Leave a service route, not a site workaround.

The mirror elevation and electrical drawing should describe the same installation. Confirm the driver position, cable-entry zone and access method with the complete mirror assembly.

  1. LocateShow the power provision and cable route relative to the mirror body and brackets.
  2. SeparateDefine lighting, demister and any other functions, including what happens when the wall switch is used.
  3. AccessAgree how the mirror is removed and how the driver or controls can be reached after completion.

Include the destination market and electrical specification in the brief; review the selected assembly against project requirements.

06 / Specification control

One schedule. Fewer assumptions between trades.

A bathroom mirror package is easier to procure when the architect, electrical contractor and fit-out team work from the same revision. Separate fixed requirements from options still awaiting approval.

Schedule itemRecord in the project briefProblem it helps resolve
Model & locationUnit type, room reference, mirror quantity and drawing revision.Mixed models or overlooked second bathrooms.
Size & setting-outWidth × height, outline, basin centreline and mounting level.Misalignment with the vanity or tile setting-out.
Finish & glassFrame material, finish reference, mirror edge and backing requirements.A finish that differs from the approved room palette.
Light & controlsIlluminated or non-lit, CCT, dimming, switching and optional demister.An operating sequence that conflicts with the electrical design.
Wall & rear assemblySubstrate, supports, fixing method, power zone and access direction.Clashes behind the mirror or restricted maintenance access.
Release & packingQuantity by phase, carton identification, spares and delivery constraints.Rehandling, mixed floor allocations or incomplete release quantities.
Start the Project Brief

07 / Mock-up & approval

Approve the details you will see every day.

Close view of even LED diffusion and a satin bronze mirror frame corner
Light & finishReview diffuser consistency, edge glare and frame joins with the selected room lighting.
Close view of an unlit frameless mirror polished glass edge and backing on protective felt
Glass & edgeReview the visible perimeter, backing and finish of the non-lit model separately.
Review together

Mirror + vanity + taps + wall finish + controls

Record clearly

Approved sample reference + drawing revision + outstanding actions

Release deliberately

Close the actions before authorising the corresponding production scope.

08 / Phased supply

Plan the package around the way the site works.

Mirror packaging concept with a partly open carton, fitted corner protectors and separate accessory box
Protective packing concept / final packing and identification are agreed for the order.

Protect the mirror. Make the model identifiable.

Apartment developments often need more than one delivery. Build the packing and release plan around the installation sequence, available storage and the teams receiving each batch.

Before release
Confirm quantities by model and phase, required dates and the latest approved schedule.
At receiving
Agree carton identification, accessory grouping and a receiving check for quantity and visible condition.
Through handover
Keep the approved model references, care information and agreed spare components in the handover record.
  1. 01Freeze the schedule
  2. 02Approve the sample
  3. 03Confirm phase quantities
  4. 04Release & identify
  5. 05Receive & record

09 / Project questions

Before you issue the mirror package.

How do we turn apartment numbers into mirror quantities?

Start with the number of each apartment type. List every bathroom and the mirrors per bathroom, then separate illuminated mirrors, non-lit mirrors and cabinets. Record agreed spares separately so the installation quantity remains clear.

What should we issue for a project quotation?

Provide a mirror or room schedule, dimensioned bathroom elevations, quantities by model, proposed finishes, lighting and control requirements, delivery location and target release stages. Identify provisional items so they can be priced and reviewed separately.

Can different unit types share one mirror specification?

Often the body, finish or control arrangement can be rationalised across several rooms. Check dimensions, basin positions, clearances and service access before treating two rooms as the same mirror type. Keep every approved variation visible in the schedule.

How should we review an apartment bathroom mock-up?

Review the complete wall with the vanity, taps, tiles, lighting and power arrangement. Record mirror position, reflections, light consistency, control operation, demister coverage if selected, and the removal route. Use the signed review to close the drawing revisions.

Can deliveries be organised by building or floor?

Include the proposed building, floor and unit references with required release dates in the enquiry. Agree carton identification, packing groups, quantities and site unloading arrangements before confirming the delivery programme.

What happens when a room layout changes after approval?

Identify the affected unit types and model references, compare the revised elevation with the approved drawing and confirm any changes to size, fixings or electrics. Review the cost and programme implications before releasing the changed model.

10 / Project enquiry

Start with the rooms, not just a mirror size.

Share your development stage, unit mix and bathroom elevations. We can review the proposed mirror scope and identify the details that need resolving for quotation and sample approval.

  • Mirror / room schedule and quantity by model
  • Dimensioned elevations and relevant wall sections
  • Finish, lighting and electrical requirements
  • Release phases and delivery destination
sales@mymirrorplus.com

All images on this page are design and coordination concepts, not photographs of completed developments.

Opens an email draft for your review. Attach the drawings in your email app. Download Brief saves a text copy; nothing is submitted automatically.

WeChat

Scan this WeChat QR code to add our contact