Mirror Cabinets / Installation & Construction

Recessed Mirror Cabinets

Set the storage body into the wall for a slim elevation above the vanity. Coordinate the cavity, tile edge and opening swing before the wall is closed.

Choose Size & Options
Double-door mirror cabinet recessed into limestone tile above a walnut vanity
Cabinet design concept

Plan the opening around the cabinet body.

Cutaway concept showing the cabinet body recessed behind the finished tile plane

Wall cavity and backing

A section drawing should locate the carcass, structural support and cable entry relative to the finished tile plane. Record the available cavity depth separately from the cabinet depth.

Single recessed mirror cabinet door ajar beside a shower screen

Door sweep beside a return

Check the opened leaf against shower glass, side walls and nearby lights. Hinge position, trim projection and the door swing need to be reviewed together.

Size & options

Configure your cabinet

Example sizes

Example dimensions are starting points for a project brief.

Enter the overall cabinet width, height and depth. Add the available wall opening and finished wall build-up to the enquiry.

Optional functions

Configuration preview

750 × 700 × 130 mmDouble Door · Recessed · Front LEDTrim treatment: Slim overlap trim

Proportions are illustrative. Confirm feasible dimensions, feature combinations and wall details on the project drawing.

Detail of a recessed cabinet trim, open hinge and internal service area at a tiled wall
Detail concept for specification review

Coordinate trim, clearance and access.

Finished opening
Reference both the rough framing and finished tile opening. Agree the permitted fitting gap and how the perimeter edge will be finished.
Body support
Locate the support and fixing points on the approved cabinet drawing. Confirm the wall construction with the project installation team.
Service access
Agree how the driver and other enclosed electrical parts can be reached once the unit and its trim are installed.

Recessed cabinet coordination schedule

ItemRecord in the briefConfirm before approval
CavityAvailable width, height and depthCheck the opening at several points and show any pipes or studs.
Wall finishTile, adhesive and wall-lining build-upConfirm trim overlap at the final wall plane.
Door envelopeHinge side, leaf widths and adjacent returnsCheck swing and finger clearance at full opening.
ServicesCable route, entry side and accessReview service access and installation sequence.
Setting-outHeight from finished floor and vanity centrelineRecord a single datum on the room and cabinet drawings.

Resolve the wall before selecting the cabinet.

Hotel bathroom schedules

Group rooms by wall build-up and opening size. Include left- and right-handed layouts in the same review.

Apartment vanity walls

Check whether the wall can receive the intended recess and whether services need to be relocated by the project team.

Refurbishment

Survey the existing cavity and finished wall first. Review a surface-mounted option where the recess is constrained.

From survey to approved opening

Provide a front elevation and a wall section with the cabinet, backing and service entry shown together.

Survey the wall

Measure the usable cavity and mark obstructions, tile thickness and adjacent fixtures.

Review the cabinet drawing

Confirm body and face dimensions, trim treatment and the required installation gap.

Approve a trial fit

Check door sweep, alignment, light operation and service access in a representative opening.

Frequently asked questions

What is the difference between cabinet size and the cut-out?

Cabinet size describes the product. The wall cut-out depends on the body, trim, fixing clearance and wall finish. Use the approved installation drawing for the opening.

Can I request a nearly flush mirror face?

Include the preferred projection above the finished wall and the opening dimensions. Hinge sweep, trim and light placement will determine the final detail.

Can a recessed cabinet include a socket or demister?

List the options in the enquiry and specify the destination market. Review the cabinet depth, component location and access for the proposed configuration.

When should the electrician review the layout?

Coordinate the supply route and service access with the project team before the wall is closed, using the approved drawing and the applicable project requirements.

OEM/ODM & Project Enquiry

Build your cabinet brief.

Send the door layout, overall and usable depth, installation drawing and quantity by model. Include unresolved wall, electrical or opening-clearance details so the quotation can address the complete cabinet.

For importers, bathroom distributors, private-label ranges and hotel or apartment project schedules.

Images illustrate proposed interiors, product details and packing concepts. They are not completed-project, factory or test evidence.

Opens an email draft for review. Add attachments in your email app or share a drawing link. Download saves a text copy; nothing is sent automatically.

WeChat

Scan this WeChat QR code to add our contact